Thursday 28 November 2013

Lynsted - Tiling the roof of the new car barn

Orchard Priory's team tiling a car barn roof
Installing the roofing tiles to this oak framed car barn

The team continue to make progress with the roof of the three bay car barn in Lynsted, as you can see from the picture above.

The ridge still remains to be installed but the bonnets and standard tiles are nearly all in place.

This should now be completed within the next couple of days.

Friday 15 November 2013

Brabourne Lees - Finished Terrace

Extended terrace, re laid with Raj Green Indian Sandstone
Finished Terrace and Steps

Stainless steel balustrade on the newly re-modelled terrace
Stainless Steel Balustrade

We are very pleased to bring you these pictures of the finished terrace in Brabourne Lees, Kent.

Having extended the terrace to provide a larger space to enjoy, we have created a lovely new set of steps to the garden below, also surfaced with Raj Green Indian Sandstone. In addition to this we have installed the stainless steel balustrade to give this terrace a stunning contemporary finish.

Wednesday 6 November 2013

Brabourne Lees - Cladding the terrace

Cladding the repaired wall on the helpfully large, existing footing
Cladding the repaired, extended wall

Work is progressing well at our current project in Brabourne Lees. The picture above shows the repaired and extended terrace being clad with bricks, sourced specifically to match in with those used in the original wall.

In digging out the existing terrace, we have found that the footing laid was larger than the structure built upon it. This has allowed us to add the cladding layer which has been tied into the original wall to ensure stability.