Tuesday, 23 April 2013

Back to an old project

Pouring the footing for a wall
Preparing the footings to re-build a wall

We are delighted to be back on site at one of our former projects. We are there to re-build a wall and install automated gates.

The job is likely to take around three weeks (it is a very long wall!).

The picture above shows one of our site team pouring the footing for a stretch of the wall having dug out a trench - great work now that the weather has finally turned.