The shingled areas have been cleared and dug down to the appropriate level |
The dug out shingled area's have been levelled with a porous asphalt |
Works are progressing on our 'resin bound' driveway project in Staplehurst.
The first photo above shows how the shingled area's of the property frontage have been cleared and dug out to the level required to meet SUDS (Sustainable Urban Drainage Systems) recommendations.
The second image shows the same area once it has been filled with porous asphalt. The level of the formerly graveled area's now matches the level of the existing driveway.
The resin bound surface will now be applied on top of the asphalt.